References

Bonded Liapor fill

 

Renovation of a retirement home in Arnstein

Some 125 cubic metres of cement-bonded Liapor Poriment LS fill were used for the 700 square metre loft area of the Pfründnerspital hospital in Arnstein in Lower Franconia. It was applied using the Kneißl mixer head method.

Construction data

Planner: Thomas Schwab
Fill manufacture: Heidelberger Beton